Editing Material Receiving Report(s)
To edit a Material Receiving Report (MRR), user role must have an “edit“ privilege enabled.

To edit other details relating to the MRR:
Switch into the Detail View by clicking the “List” button in the folder tree’s toolbar.
Edit the needed fields.

All changes are saved automatically.
Once the MRR is edited, a success alert will appear in the top-right corner with the message:
“Material Receiving Report was successfully edited “
Note: An MRR can only be edited when its Status is not set to “Closed”. To edit closed MRR they must be re-opened first.